Client
ŽĎAS a.s.
Place of realisation
Žďár nad Sázavou, Czech Republic
Realization
Q3/2014
Country
Czech Republic
For
Delivery of a complete electrical installation of the crane. Operation from the crane seat or via a remote control system; an air-conditioned cabin is mounted beneath the crane bridge. All drives are controlled by frequency converters.
Environment
- Heat treatment shop
- dusty environment
- elevated temperatures
Interesting facts
The main hoist is equipped with a double trolley frame enabling precise weighing.






















