Client
Pilsen Steel s.r.o.
Place of realisation
Plzeň, Czech Republic
Realization
Q4/2007
Country
Czech Republic
For
Delivery of a complete electrical installation for a 250/(80/20)t forging crane. Operation from control rooms located on the shop floor, with the option of remote control. PLC-based control system with clear and intuitive visualization.
Environment
- Forge for shaft semifinished products
- high dust levels
- elevated temperatures
Interesting facts
The complete reconstruction was carried out in record time during the New Year shutdown. The cables in the cable festoon system of the 250t trolley weigh more than 1 ton.