Client
ČEZ a.s.
Place of realisation
Dukovany
Realization
Q3/2008
Upgrade of a pair of cranes in the machinery hall of the 3rd and 4th power plant units. Hoist drives are controlled by frequency converters. Installation of safety brakes on the main hoists. PLC-based control system. Circuit diagnostics displayed on a touchscreen in the cabin.
Environment
Elevated temperature
Interesting facts
The cranes can operate in synchronous mode, maintaining a constant tilt of the handling spreader suspended from the hooks of both cranes.