Client
Lafarge
Place of realisation
Cauldon, England
Realization
Q1/2021 - Q1/2022
Country
England
Delivery of a complete handling system for transporting SRF and shredded tires (alternative fuels). PLC-based control.
Fully automatic operation with the option of manual control via a joystick remote control.
The control panels located in the control room are protected against adverse external influences (dust and moisture) from the stored material.
Environment
- warehouse for alternative fuels and shredded tires
- indoor





















